Worcester Announces 2025 Fall Leaf Collection Program
Emergency Radios / WPS
Furnish and deliver Motorola emergency radios per WPS specifications.
Addenda #1 issued 10/16
Addenda #2 issued 10/17
Parking Lot Lighting - Blithewood Park / DPRC
Description of Work: Furnish, install, and energize four (4) DPRC Standard Holophane light pole and fixture specified on pre-existing concrete bases with anchor bolts, electrical service upgrade, electrical conduits, handholes, and associated misc. site work.
Estimated Cost $140,000
Addendum #1 Released - 10/27/25 (due date extended to Friday 10/31/25)
Addendum #2 Released - 10/28/25
WPD Officers Arrest Male for Possession of Crack Cocaine with Intent to Distribute
Heating System Upgrade 29 Albany Street
This project includes the upgrade of the heating system for the 13,500 SF building located at 29 Albany street, Worcester, MA. Installation includes new gas fired unit heaters. Selective demolition of existing systems shall be required.
Filed Sub-Bids required are as follows:
Request for Qualifications - Trade Contractors South Division Fire Station
PROJECT DESCRIPTION: The City of Worcester is proposing to construct a fire station at 25 Madison St. in Worcester, MA. The new building will be a two-story mostly brick façade of approximately 30,000 square feet. Work is anticipated to begin May 2026. Occupancy is expected in June 2027. The proposed South Division Fire Station project is comprised of one phase, with the construction site located in a densely populated neighborhood, at the intersection of Madison Street and Southbridge Street.