Skip to main content

Kitchen Relocation - Vernon Hill School / WPS

Bid Details

Friday, July 31, 2026

Note to Bidders - For any bid or RFP document and any addenda that are received electronically, it is the responsibility of every bidder who receives this bid or RFP and all associated documents to check this website for any addenda. The City of Worcester accepts no liability to provide accommodation to bidders who submit a response based upon information obtained from its website. Bidders may not alter (manually or electronically) the bid language or any bid documents. Unauthorized modifications to the body of the bid, specifications, terms or conditions, which change the intent of this bid or RFP are prohibited and will disqualify a response.

Bid Number:
8778-M7
Industry:
C. 149A/Filed Sub Bids - Vertical Construction
Open Date:
Filed Sub Bids Date:
General Bid Close Date:
Contact:
Stephen McDonald, Assistant Purchasing Agent
Comments:

Vernon Hill School Kitchen Relocation involves moving the kitchen and cafeteria from the third floor to a new basement location and completing all work needed to make the space fully operational. This includes installing WPS‑provided equipment, selective demolition, a new exterior equipment slab, and new plumbing and HVAC systems with temporary HVAC measures during installation. 

Estimated Cost: $308,000.00

DCAMM: General Building Construction

Filed Sub-Bids: Plumbing, HVAC

Pre-bid Meeting: August 12, 2026 at 10:00am - Vernon Hill School - 211 Providence Street Worcester MA 01607

Standard Form(s):
Plan Holder(s)*:
Filed Sub Bids Results:
Bid Results:
Awardee(s):

*APPLIES TO CONSTRUCTION BIDS ONLY - All City of Worcester bids are available for downloading from the City of Worcester website with no required registration process. As a result, the City accepts no responsibility for the accuracy of plan holder lists issued.