Skip to main content

DCU Center Structural Upgrades-Rigging Grid/DPF

*****Addendum #2 posted 6/30 to extend deadline to 7/12/23 at 10 am.

*****Addendum #1 posted 6/28 to extend deadline to 7/5/23 at 10 am.

Scope: Provide all labor, equipment, materials and supervision necessary and proper for additions to existing Arena structure to accommodate greater rigging loads for main events as per the attached specifications & requirements of the City of Worcester. 

Estimated cost: $2,067,287

DCAMM Certification required: General Building Construction

Water Main Replacement (#186-23)/DPWP

***ADDENDUM #3 POSTED 7/3/23  ADD PAGE TO PROPOSAL SECTION.

***ADDENDUM #2 POSTED 6/30/23  BID DEADLINE EXTENDED TO 7/12/23 AT 10AM.

***ADDENDUM #1 POSTED 6/28/23  BID DEADLINE EXTENDED TO 7/5/23 AT 10AM.

Water Main Replace: Work to include furnish all labor, materials, equipment and incidentals necessary to the replacement of water mains, including hydrant and site work at various locations including Brandon Road and other locations listed in bid documents.

Estimate: $3,200,000